The failure of the Edenville Dam in 2020 led to the evacuation of approximately 10,000 residents and caused significant flooding downstream. The new spillway aims to prevent similar disasters by automatically managing excess water during extreme flood events. However, the reconstruction process has been costly, with an estimated $142.8 million allocated for Edenville alone and $370 million for all four dams. Property owners in the area are bearing a substantial portion of these costs. While the new spillway reduces the risk of future failures, the region remains vulnerable to extreme weather events, and residents must remain vigilant.